Note
Operation Test
Carry out the Idle Air Control Inspection. (See Idle Air Control System Inspection.)
Resistance Inspection
1. Disconnect the negative battery cable.
2. Disconnect the IAC valve connector.
3. Measure the resistance between the IAC valve terminals using an ohmmeter.
Specification
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION.)
2. Inspect the following wiring harnesses for open or short (continuity check).
Open circuit
- IAC valve terminal A (harness-side) and PCM terminal 4G
- IAC valve terminal B (harness-side) and PCM terminal 4J
Short circuit
- IAC valve terminal A (harness-side) and power supply
- IAC valve terminal A (harness-side) and GND
- IAC valve terminal B (harness-side) and power supply
- IAC valve terminal B (harness-side) and GND
Mazda 6 Service Manual: Special tools
ENGINE
Ford SST numbers are collated with Mazda SST numbers in the example below.
Ford SSTs are marked with Ford SST number.
Example
1: Mazda SST number
2: Ford SST number
LUBRICATION SYSTEM
COOLING SYSTEM
FUEL AND EMISSION CONTROL SYSTEMS
CLUTCH
MANUAL TRANSAXLE
AUTOMATIC T ...
Mazda 6 Service Manual: Front/rear abs wheel-speed sensor inspection
Visual Inspection
Remove the wheel and tire, and inspect the sensor for looseness and damage.
Replace the sensor if necessary.
Clearance Inspection
Inspect the clearance between the wheel-speed sensor and the sensor rotor.
Clearance
0.3-1.1 mm {0.012-0.043 in}
Resistance Inspection
...