1. Remove in the order indicated in the table.
2. Install in the reverse order of removal.


Accelerator Cable Installation Note
Carry out the ACCELERATOR CABLE INSTALLATION/ADJUSTMENT procedure after installing the accelerator cable. (See ACCELERATOR CABLE INSPECTION/ADJUSTMENT.)
Variable tumble control solenoid valve inspection
Accelerator cable inspection/adjustmentMazda 6 Service Manual: Dtc b1318
Caution
When attaching the tester lead to the ABS (ABS/TCS) HU/CM harness
connector, the SST (49 G066 001) must be used. (See ABS (ABS/TCS) HU/CM
INSPECTION.)
Diagnostic procedure
...
Mazda 6 Service Manual: Panel light control switch inspection
1. Connect the connector to the panel light control switch.
2. Connect the negative battery cable.
3. Measure the voltage at the panel light control switch using voltmeter.
When inspecting terminal B for continuity, disconnect the panel light
control switch connector.
4. If the value are ...