1. Disconnect the negative battery cable.
2. Remove the dashboard. (See DASHBOARD REMOVAL/INSTALLATION.)
3. Remove the A/C unit. (See A/C UNIT REMOVAL/INSTALLATION.)
4. Remove the blower unit.

5. Install in the reverse order of removal.
Basic system
Blower unit disassembly/assemblyMazda 6 Service Manual: Oil cooler flushing
Note
The contaminated cooler line (oil pipes and hoses) and auxiliary
cooler must be flushed completely when ATX is overhauled or replaced.
1. Remove the two oil cooler line hoses and apply air pressure of 196 kPa
{2.0 kgf/cm2, 28 psi} from the return hose (pipe) side.
Caution
Power ...
Mazda 6 Service Manual: i-ELOOP
i-ELOOP is a regenerative braking system. When you depress the brake pedal or
use engine braking, the kinetic energy that occurs is converted to electrical energy
by the power generator and the converted electrical energy is stored in the rechargeable
battery (capacitor and battery). The store ...