Connect battery positive voltage to terminal A and ground to terminal B of the blower motor and verify its operation.

Blower motor removal/installation
Resistor removal/installationMazda 6 Service Manual: Refrigerant system service procedures
GAS CHARGING SET INSTALLATION
1. Fully close the valves of the SST (49 C061 001).
2. Connect the SSTs (49 C061 002, 49 C061 003) to the high- and
low-pressure side joints of the SST (49 C061 001).
3. Connect the SSTs (49 C061 006A, 49 C061 007) to the ends of the
SSTs (49 C061 002, 49 C061 00 ...
Mazda 6 Service Manual: Immobilizer system reprogram procedure
Note
When an error occurs during the reprogram procedures, except when
the PCM is replaced, repeat the procedure from Step 1. If you still cannot
reprogram, confirm how many keys can start the engine. Then, perform the key
replacement or addition reprogram procedure according to the val ...