Battery
Inspect the battery in the following procedure.

Test load chart

Battery positive voltage with load

Back-up Current
1. Verify that the engine switch is at OFF and that the key has been removed.
2. Disconnect the negative battery cable.
3. Measure the back-up current between the negative battery terminal and the negative battery cable.
- Inspect and repair harnesses and connectors of the fuse at which the current decreases.
Back-up current
20 mA max.
Caution
Battery removal/installation
Battery rechargingMazda 6 Service Manual: Pcm configuration
1. Connect the WDS to DLC-2.
2. Set up the WDS (including the vehicle recognition.)
3. Select Module programming.
4. Select Programmable module installation.
5. Select PCM and perform procedures according to directions on the WDS
screen.
Note
If PCM CONFIGURATION is successful, the PCM ...
Mazda 6 Service Manual: Engine tune-up
IGNITION TIMING INSPECTION
Note
Ignition timing is not adjustable.
Ignition timing verification requires WDS or equivalent.
1. Turn off the electrical loads.
2. Warm up the engine as follows.
(1) Start the engine.
(2) Maintain the engine speed at approx. 3,000 rpm until the
cooli ...