1. Remove the evaporative gas check valve (one-way).
2. Apply pressure to port A, and verify that there is no airflow.
3. Apply negative pressure to port A, and verify that there is air flow.

Charcoal canister inspection
Purge solenoid valve removal/installationMazda 6 Service Manual: No.8 no cool air
When performing an asterisked (*) troubleshooting inspection, shake the
wiring harness and connectors while performing the inspection to discover
whether poor contact points are the cause of any intermittent malfunctions.
If there is a problem, check to make sure connectors, terminals ...
Mazda 6 Service Manual: Radiator
RADIATOR REMOVAL/INSTALLATION
1. Disconnect the negative battery cable.
2. Drain the engine coolant. (See ENGINE COOLANT REPLACEMENT.)
3. Remove the cooling fan. (See COOLING FAN REMOVAL/INSTALLATION.)
4. Remove the oil hose. (ATX)
5. Remove in the order indicated in the table.
6. Install in t ...