Caution
Note
1. Remove the transmitter cover.
2. Apply the circuit tester leads to the positions as indicated in the figure.

3. While pressing the battery as shown in the figure, press the LOCK and UNLOCK buttons on the transmitter at the same time to start measurement of the voltage.

4. Release the buttons after 5 seconds.
5. Verify that the minimum voltage is the standard voltage or more for 10 seconds
after starting measurement.
Standard voltage
2.7 V
Transmitter battery replacement
Trunk lidMazda 6 Service Manual: Front door glass removal/installation
1. Operate the front door glass so that the distance from the top of the
front door glass to the upper part of the rear beltline molding is 210 mm
{8.3 in}.
2. Disconnect the negative battery cable.
3. Remove the front door trim.
4. Remove the hole cover.
5. Remove the screws.
6. Insert ...
Mazda 6 Service Manual: Pid/data monitor inspection
1. Connect the WDS or equivalent to the DLC-2.
2. Measure the PID value.
Note
Perform part inspection for the output device after PCM
inspection.
The PID/DATA MONITOR function monitors the calculated value of the
input/output signals in the PCM. Therefore, if a monitored value ...