Caution
Note
1. Remove the transmitter cover.
2. Apply the circuit tester leads to the positions as indicated in the figure.

3. While pressing the battery as shown in the figure, press the LOCK and UNLOCK buttons on the transmitter at the same time to start measurement of the voltage.

4. Release the buttons after 5 seconds.
5. Verify that the minimum voltage is the standard voltage or more for 10 seconds
after starting measurement.
Standard voltage
2.7 V
Transmitter battery replacement
Trunk lidMazda 6 Service Manual: Fuel tank inspection
Caution
Disconnecting/connecting the quick release connector without
cleaning it may possibly cause damage to the fuel pipe and quick release
connector. Always clean the quick release connector joint area before
disconnecting/connecting using a cloth or soft brush, and make sure that it ...
Mazda 6 Service Manual: Pid/data monitor inspection
1. Connect the WDS or equivalent to the DLC-2.
2. Measure the PID value.
Note
Perform part inspection for the output device after PCM
inspection.
The PID/DATA MONITOR function monitors the calculated value of the
input/output signals in the PCM. Therefore, if a monitored value ...